
Construction of critical infrastructure at Kennedy Space Center, including approximately two miles of force main, an 8-foot by 20-foot polymer lift station, directional drilling, replacement of existing water mains, storm drainage systems, dewatering operations, and multiple triple-barrel 42-inch RCP crossings beneath active roadways.